Skip to showcase

Command view · FSR baseline

Wind-Solar-Storage Integrated Power Station at Huailai Zhongji Sion Mining Area

HL-WSS-2026-FSR-V0.1Exit to site

Zhangjiakou zone · mining SGLS

Zero-carbon
orchestrated

GW-class wind-solar-storage with behind-the-meter first and surplus export; digital twin & AI dispatch targeting NMAE ≤ 8%. Figures follow FSR V0.1 disclosure.

Project IRR
28.7%
Peak construction
600+
350.83MWp

PV capacity (Phases I–III, peak)

100MW

Wind capacity (Phases I–III)

100 / 200MW·MWh

Storage power / energy (Phases I–III)

14.85bn RMB

Total CAPEX (I–III)

41.5%

Equity IRR (base)

41.710⁴ t CO₂/a

Annual CO₂ avoided

Four-phase pathFSR §1.1.5
Phase I (demo)
PV 30 kWp
Wind 5 kW(垂直轴样机)
ES 3 MW / 9 MWh(30 台重卡动力电池作储能)
Phase II
PV 800 kWp
Wind 50 kW
ES 500 kW / 1 MWh
Phase III (main body)
PV 350 MWp
Wind 100 MW
ES 100 MW / 200 MWh
Phase IV (strategic)
PV 1 200 MWp
Wind 200–400 MW
ES 300 MW / 1.2 GWh
Self-production, self-crew, self-land, and behind-the-meter supply — structurally lowers unit CAPEX and improves economics vs. grid-purchase tariffs. · Demo → BIPV sheds → main GW-scale build → strategic reserve — staged CapEx with minimal rework. · PV + wind + 4h storage + SVG / AGC-AVC for reliability and power quality in heavy industrial loads. · Generation forecasting, full-life SOC tracking, and intelligent dispatch (target NMAE ≤ 8%). · 600+ peak construction jobs · FSR HL-WSS-2026-FSR-V0.1